Hi,
Does anyone know the logic for IFS Apps 10 when running costing for one specific part status, how does IFS determin what parts to include in the run?
In the background job it will show x nr of top parts where detected.
The number here is much larger then top parts with the specific part status.
Thanks in advance!
Anna