One of my customers are encountering the following issue. Would like your advice and feedback on the below issue.
Use of QA trigger for production scheduled parts
We are using IFS Production Schedules and would like to create QA control plans systematically for the QA analysis. IFS Control plans do not work for IFS production scheduled parts.
Question:
How can we create automatic creation of QA control plans for QA with using IFS Production schedules for the manufacturing process?
Error Message: Sample Frequency trippers cannot be used for production schedule parts
Test plan
1. Create a manufactured part that will be produced by a production schedule
2. Create a QA control plan for the part
3. Attempt to create Sample Frequency Trigger (tab)
a. Any parameters
b. Save and note error message
Are there other alternatives to create the control plan? We would like to create this every ½ hour for each part on the production schedule.
Page 1 / 1
Please note that Sample Frequency Triggers on Production scheduled parts are not allowed. It shall not be possible to define and connect Triggers for Control Plan Manufacturing for a Production Schedule Supply Part.
Reply
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.