Skip to main content
Question

Purchase control plan and supplier for purchase part quantity to inspect


Forum|alt.badge.img+1

If a part has a receive case inspection code of C, with a qty to inspect of 5, and the part has a purchasing control plan, with different inspection codes and qty to inspect, what quantity to inspect amount will get pulled into the receipt as the quantity to inspect.

6 replies

Yathartha Karunananda
Hero (Employee)
Forum|alt.badge.img+12

Hi ​@Anneemaree,

As I remember it, the highest sample size from the active control plan is what populates the Qty to Inspect field.


Forum|alt.badge.img+1
  • Author
  • Do Gooder (Partner)
  • October 9, 2026

Thanks ​@Yathartha Karunananda so it seems to ignore the qty to inspect on the supplier for purchase part and only uses the value from the control plan data point lines? 


Yathartha Karunananda
Hero (Employee)
Forum|alt.badge.img+12

Hi ​@Anneemaree,

Yes. This is mentioned in the product documentation:

 


Forum|alt.badge.img+4
  • Do Gooder (Employee)
  • October 9, 2026

Hi @Anneemaree

 

If Mandatory Analysis is enabled, the receipt initially uses the active control plan's highest sample size, rather than automatically using 5.

Is Mandatory Analysis enabled for this supplier/part, or is only the control plan mandatory?

 

Thanks,

Gleb


Forum|alt.badge.img+1
  • Author
  • Do Gooder (Partner)
  • October 9, 2026

thanks so much ​@Yathartha Karunananda 


MikeCH
Superhero (Employee)
Forum|alt.badge.img+13
  • Superhero (Employee)
  • October 12, 2026

Hi ​@Anneemaree 

Additional information to the previous points. Whenever the system generates an analysis using the control plan trigger for a receipt, the maximum quantity is taken from the control plan data points contained in that analysis.