Hi All,.
Do we have any inbuilt report in IFS which can tell what is the waiting tine between two operations.?(historic) What I mean is it will provide detail of SO no Current operation Status ( When started) and Closed? and what is the next operation starting time so that we can see what is the waiting time between two operations? or any useful report which can tell the which operations has delayed or which job has currently delayed? etc