Hi,
I have a part with four routing alternates, each of them using a Min Lot Size Based Qty and each of these alternates have an operation connected to a different Work Centre. The Phase In Date for the routing and Validity Period are set to 25th July.
I ran the MRP and CRP and here’s the error message I get when trying to convert a Shop Order Requisitions into a Shop Order.



The Work Centre has capacity for that date-the total time for this shop order proposal would be less than an hour-.
What did I do wrong ?