NCR and resulting cost- where to see them against NCR

  • April 24, 2026
  • 1 reply
  • 9 views

Vulcan
Do Gooder (Partner)
Forum|alt.badge.img+1

Hi All, 

Is there a way to directly link or associate costs with an NCR in IFS?

When a non-conformance is raised, can the cost related to that NCR be captured directly against it?

For example, if the NCR results in scrap, would the cost be captured only through the inventory scrap transaction or related shop order, rather than being directly tied to the NCR itself?

Appreciate your guidance on this.

Thanks

1 reply

Björn Hultgren
Hero (Employee)
Forum|alt.badge.img+25

My gut feeling is that it would be easier to follow up costs for non conformances by using MRB rather than NCR since the MRB is linked to the part, quantity and object (like shop order). Still I guess some kind of CRIM would be required that catches the scrap cost, or in case of rework, the cost of the added operation of the type rework.