We are desiring to setup multi site planning with 2 sites and use distribution orders to generate supply/demand between the sites. When I run MRP I am failing to generate any distribution orders. Does a guide/instruction manual exist outside of the online help to ensure we are setting everything up correctly?
Page 1 / 1
Hi
I think the below post will help you with the setup and more information.
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.