Skip to main content

We are desiring to setup multi site planning with 2 sites and use distribution orders to generate supply/demand between the sites. When I run MRP I am failing to generate any distribution orders. Does a guide/instruction manual exist outside of the online help to ensure we are setting everything up correctly? 

Hi @ericwats ,

 

I think the below post will help you with the setup and more information.