Community,
would like to borrow your mind here. Multi-site BOM set up procedure.
for example a manufactured product 20-100. it is to be manufactured in 2 sites.
20-100 (manufactured) - site 101
- 20-110 (purchased raw) - site 101
- 20-120(purchased raw) - site 101
- 20-120 (manufactured) - site 102
- 20-121(purchased raw) - site 102
Site 101 will do final assembly for part 20-100, site 102 will manufacture part 20-120 and via distribution order transfer the material 20-120 to site 101 to do the final assembly.
so, question here. from Engineering Transfer, how I could transfer to site 101 with part 20-120 Purchased Raw part type? since part 20-120 is already defined as a manufactured part.
I have tried Detailed Transfer, in Engineering Part Transfer Graphic window, the part type cannot be changed, as I am planning to change the part type from Manufactured to Purchased Raw for part 20-120 in site 101.
Thank you.