Need a little guidance here. I created a lot-controlled part with a lot size of 1 and it created the as-built structure for each lot I created. I have a repair structure and a repair routing, and I create a repair shop order and ensure that I turn on multi-level repair before I save the shop order.
I am getting the materials that I may issue as part of the repair as materials as well as the finished good part on the shop order materials. I then manually reserve the lot number of the finished good part but here’s the rub. I am NOT getting the multi-level repair structure as I have in the past with serialized parts. What am I missing??
The documentation says it’s possible but…
Thanks in advance!