Hi,
We had a set up like below on our routings. There were 2 operations – first extruding, second packing. As we did not want to report each operation separately so we chose milestone operation - when we reported second operation the first one was automatically reported.
As extrusion and packing usually happens parallel we changed the parameter on second operation into parallel.
From that moment automatic reporting of previous operation stopped working. To solve the issue we started using ‘Auto report of operation parameter’ when we completed into stock.
The problem appears if we add one more operation to above connected to finishing. We would like to have operation first and second reported when we report second operation. However because of parallel parameter operation first is not reported. It is reported when the last (third) operation is reported .That causes issues – especially that components are not buckflused when consumed. Is there any way to solve it?
Best regards,
Bernadeta