Hello,
I have a master scheduled part with a safety stock defined.
Current situation:
- On 16-Dec, Master Scheduling generates a Shop Order Requisition proposal because the projected on-hand quantity falls below the safety stock level.
- However, on 17-Dec, there is already an existing shop order supply due, which replenishes the inventory and brings the projected on-hand quantity back above the safety stock level.
As a result, Master Scheduling creates an additional supply proposal even though a valid supply already exists shortly afterward, effectively resulting in excess or duplicated supply.
Is there a parameter or setting that allows Master Scheduling to look ahead a certain number of days when evaluating safety stock shortages, so that near-future supplies are considered before generating new replenishment proposals?
If so, which setting controls this behavior and how is it typically configured?