Is there a look-ahead parameter for Safety Stock Replenishment? How to Prevent Master Scheduling from Generating Additional Supply When Future Shop Order Supply Exists?

  • Nov 25, 2026 12:22 PM UTC
  • 0 replies
  • 9 views

Forum|alt.badge.img+6

Hello,

I have a master scheduled part with a safety stock defined.
Current situation:

  • On 16-Dec, Master Scheduling generates a Shop Order Requisition proposal because the projected on-hand quantity falls below the safety stock level.
  • However, on 17-Dec, there is already an existing shop order supply due, which replenishes the inventory and brings the projected on-hand quantity back above the safety stock level.

As a result, Master Scheduling creates an additional supply proposal even though a valid supply already exists shortly afterward, effectively resulting in excess or duplicated supply.

Is there a parameter or setting that allows Master Scheduling to look ahead a certain number of days when evaluating safety stock shortages, so that near-future supplies are considered before generating new replenishment proposals?

If so, which setting controls this behavior and how is it typically configured?