Introduce MRP Action Message to highlight non-availability of stocks under 'one lot allowed' situations

  • 21 February 2022
  • 2 replies
  • 98 views

Userlevel 5
Badge +8
  • A Shop Order is created for 10 pcs for top part A which needs 10 pcs of part B as a component. 
  • Part A is set with component Lot Rule as one lot allowed.
  • Currently the part B is in stock in two lot batches.
    • a. Lot 1 – 6 pcs
    • b. Lot 2 – 5 pcs
  • Quantity required of Component Part B is 10 pcs, quantity available is 11 pcs but it cannot be used due to the component lot rules; no Single lot batch is available to fulfil the full qty of 10 pcs. 
  • System will give the below error if tried to reserve manually.
  • But MRP will not create any supply requisitions in this situation MRP consider only the quantity!  but what is on hand cannot be fulfil the requirement - Error!

 

Suggestion:

-Introduce MRP Action Message/s to notify similar situations by highlighting the non availability of single lot batch no. to fulfil demand. 


This topic has been closed for comments

2 replies

Userlevel 6
Badge +12

Hi,

As you perhaps know, MRP does the netting per part and per day. And not per part, day and order.

So in the general case - the gross requirement of 10 for the specific day could come from 10 different demand order lines, 1 each.

What I wanted to say is... it is not that easy to fine-tune MRP engine in every aspect. We also have the overall performance to consider as well.

-Mats

Userlevel 5
Badge +8

Hi,

As you perhaps know, MRP does the netting per part and per day. And not per part, day and order.

So in the general case - the gross requirement of 10 for the specific day could come from 10 different demand order lines, 1 each.

What I wanted to say is... it is not that easy to fine-tune MRP engine in every aspect. We also have the overall performance to consider as well.

-Mats

@majose Thank you for the explanation!