Question

Interim order for multilevel non-configurable parts

  • 26 April 2023
  • 1 reply
  • 61 views

Userlevel 6
Badge +11

Hi,

 

before releasing a DOP,  i would like to see and evaluate the multilevel structure using a interim order header. For configurable parts this works fine, but can’t I do the the same for a multilevel shop order which is not configured?

 

I would like to see the same process as we would do in DOP header - create full level (so all the way down, both DOP and non DOP parts)

 

Best regards!


1 reply

Userlevel 4
Badge +9

At the moment 22R1 DB is down for its overnight build.

In apps 10 and below, there is a way to achieve this by changing the “Supply Code” in the Customer Order Line to “DOP Order."
Then the capability check calculation is executed as if all the Parts in the Structure are DOP Supplied, So you will see the interim orders for the sub levels as well.

 

Reply