Skip to main content
Question

Inquiry on Separately Controlling Material Requisition and Shop Order Goods Issues

  • September 3, 2026
  • 0 replies
  • 6 views

Forum|alt.badge.img+1

I would like to ask whether there is a way to control material issues for Material Requisitions and Shop Orders separately.

Currently, we would like to achieve the following:

・Allow material issues based on Material Requisitions from a specific storage location.
・Prevent material issues based on Shop Orders from the same storage location.

We have reviewed the Part Availability Controls functionality; however, it appears that this setting controls both Material Requisition issues and Shop Order issues in the same manner.

Is there any alternative method, configuration, or functionality that would allow these two processes to be controlled independently?