Hello,
We use ifs app 2004 for our company.
We have a problem with the costing in our site (Mx), labor hours load in the system but doesn’t get in the final costing.
Material costing is loaded in the shop order but we cannot get any of the labor hours in the costing of the shop order.
The labor class is still current with expiration date of 2029.
We saw the labor hours are loaded in the shop order, but is shows costing 0 for every iteration of the hours loaded.
Part was created as "manufactued", and template costing configured for manufactured.
This is a thing only happening in mx site, we did a test for another site (US) and it is showing costing of labor hours right.
We don't have an idea of whats going on.
I appreciate if anyone can help us.
Thank you.