Hello,
We are manufacturing continuously a mesh.
To produce this I am using a wire (part set up with kg), from which I am cutting it into pieces and further welding those pieces together to obtain a final product.
Current BOM:
- Wire [kg] → assigned to cutting operation
- At this level we are providing at the custom field number of pieces that shall be cutted from the wire
Current Routing:
- Cutting
- Welding
We would like to display on the Shop Order Work Instruction Report an assignment of the materials to the operation so the operators know how many pieces of the wire go into the welding operation. So ideally:
- Cutting - display of wire
- Welding - display of wire (but no consumption and no costs, as the same wire was already processed in the operation above).
As currently wire is assigned to the cutting operation, I am not able to reassign the same wire at the operation of welding displaying the same information as at the cutting.
I had tried to set up a separate material line using the same wire part as Not Consumed (just to populate the information), however I can see that the system is calculating the estimated material cost using this wire. How possibly obtain the desire without having the material calculated in the estimations?
The cost parameter on the Costing for INCLUDE_NOT_CONSUMED=No.