The use case is like this.
In a factory the customer has an area for assembly. The area is a Work Center and have 10 separate places wher assembly of a product can be executed. Each place is defined as a Resource in the Work Center.
The Routing is set-up with multiple Opearation but use that same Work Center.
The Product to be assemble, is in reality started and completed in one of the places inside the Work Center, all Opeartions are done in the place and should use one Resource only for all Opeartions done in the Work Center. The standard logic shedule the Operations to use different Resources.
How can you use the standard logic to pick available Resource for first Operation+Work Center and use same Resource for all Operations in that Shop Order per Work Center?