How to create a control plan which is triggered by 'start shop order ' and manual combined

  • 21 November 2022
  • 1 reply
  • 171 views

Badge +3
  • Sidekick (Customer)
  • 5 replies

In BGB, we are testing the manufacturing control plan for shop order operation testing. We would like to cover the 3 testing scenarios, by default, system offers standard feature to for collect data per shop order operation for settled sample quantity. That is fine and will be ok for basic full testing scenarios. But it cannot cover the random testing requirements. For instance, there are 4 shop orders produced in one line production line within 1 day. The random testing requirement is not based on shop order, but based on production line. So in that case, we would like to manual trigger one of shop order to collect variable data.

 

Hereby, the question is how to setup those random control line that is triggered by manual according to business requirement?

 

Our expectation is like:

data point 1/2/3/5 is triggered by starting shop order based on inspection code sample quantity, which will cover full testing scenario. Data point 4 is triggered by manual, which will cover random testing scenario according to business need.

Trigger connection by  trigger type, But the manual trigger type is not working.

Can someone help me out? thanks.


1 reply

Userlevel 4
Badge +7

The Manual Trigger Type is used in conjunction with Custom Events. For more information see this thread: 

 