At our production site we need to pack parts before the leave production. Therefore, I would like to add a non-consumed part to the structure which holds a cost of 15, - euro to add cost for packing. When I recalculate the structure in cost set 5 I do see the part with its cost in structure multilevel tab but no costs are added to the level sales cost.
In which way can I add these costs?