Question

Estimated Material Cost from Estimate screen

  • 8 June 2021
  • 1 reply
  • 229 views

Userlevel 3
Badge +7

We used the Estimate screen to develop product estimated material cost.  Each component has a direct material cost per unit.  We used Transfer Estimate Products to generate Inventory Parts.  Is there a standard method in IFS to set the estimated material cost for purchased Inventory Parts equal to the direct material cost per unit from the product Estimate?  If not, how do you do it?


 

(circled field is what we are trying to populate via the Estimate screen)

 

Thank you in advance for your response!

 

Marty

 

(cross-posted from Technology forum)


This topic has been closed for comments

1 reply

Userlevel 4
Badge +7

Hi @MWitczak,

 

This looks like a scenario which has not been handled yet by our R&D (Product Development) team.

Could you please send a Support case. IFS Support team can work with R&D team and come up with a possible step (patch or an enhancement).

 

For the moment, we only can manually enter Estimated material cost in Inventory Part Cost tab.

 

Thanks,

Jagath