  • I have a work order where the Dept is populated for Pre Posting.

 

  • I try to connect the work order to a project activity
  • After entering the project activity data, I click on the OK button and get the following error message and the activity is not connected.

 

  • When I open the Pre Posting window, there is a Dept entered. 
  • What do I need to do to connect the activity to the work order? (we are using IFS 9)
Be the first to reply!