Hi
When we do an Engineering Revision Transfer our manufacturing site complain that data in the product structure is being overwritten.
They have entered data in column “Consumption Item”. Some parts they have set as “Consumed” and some parts in the same structure have been set as “Not Consumed”.
However, when we do the transfer, all parts are changed to “Consumed” which is quite annoying.
Also data as Scrap factor and Reserve/Issue from Loc are being overwritten.
Can anybody tell me how we can prevent this overwriting of data?
Best regards
Tove Virkelyst
Question
Engineering Rev. Transfer overwrites data in product structures
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.