DOP Load in Visual Capacity Requirement Planning

  • November 24, 2025
  • 2 replies
  • 22 views

Forum|alt.badge.img+6

What is the criteria to get load from DOP Order to be visible in visulized in 24R2. 
I have same site, part no, routing and in one DOP I get load and in unother I don’t get load. Both DOP Headers are ‘Unreleased’


 

 
 

2 replies

Björn Hultgren
Hero (Employee)
Forum|alt.badge.img+25

If I remember correctly it should populate the Visual Capacity Requirements page with the load and capacity for the work centers, labor classes and date interval relevant for that DOP order or DOP header (structure). Have you calculate the labor and machine load and CRP for this period?

From 25R1 you can choose to schedule and create load for DOP order operations instantly without having to run CRP.  


Forum|alt.badge.img+6
  • Author
  • Do Gooder (Customer)
  • November 25, 2025

Thank you, the resource data set-up was changed->issue