Hello,
We are currently starting to work with disassembly workflows, as an addition to our standard assembly process. The aim is to receive a good that is to be retrofitted in our factory, and to track the whole process in the system.
We have been able to create disassembly structures and use them in shop orders, but we now would like to have it work as what we normally do on our assembly processes.
For example, we typically link each assembly to a project activity (Project/Sub Project), and in the contexte of this current project, linking both disassembly/assembly would be a way to track the overall cost of the disassembly/assembly process on the subproject.
It seems like this feature is not possible for this kind of shop order (Link), is it possible to confirm it ?
Many thanks for your help,
Aurélien POIRIER
IFS Cloud 23.2.23