Hi,
We have set up the Master Schedule module to create forecasts for manufactured parts related to Configuration Structures.
MRP correctly goes through all the levels of the structure for material requirements calculation.
We expected the same behaviour for the CRP process for labor, but we have noticed that only the first level of the Configuration Structure is taken into account by CRP for the Master Schedule source (it works correctly for Shop Order or DOP sources).

Are there any known limitations or particular setup requirements?
Thank you in advance.
IFS Current version : 25R2 SU5