Extending functionality on DOPs – connection of DOP components to operations – mentioned in 25R1. We have SU 25.1.2 + APB released on 2025-01-20. See behavior, seems does not work correctly:
DOP – 3 levels, component T-2 is connected to Operation 20 of T-1.

The same connection on SO:

APB before scheduling – just scheduler by IFS – OK

Parameters of scheduling in APB:

After scheduling in APB – connection to operation 20 ignored:

Thanks in advance.