I need some advice from a production schedule guru. I am running a production schedule and midstream, I want to change a component in the structure and then keep running the production schedule. The component is a lot controlled item. Any ideas as to how best do this? I know I can edit components midstream but I need to do a report against the production schedule to allow this. Also, I am swapping one lot controlled component to another component.
Any guidance you may have will be appreciated!