Skip to main content

Hi, I need some advice.

COPYING COST SET 2 TO COST SET 1. Without Capture Cost Sources set to “on” the material cost from the product structure (Bill of material) do not get connected via the connected object setting in the project. Any insight please.  See word document attached.

 

Regards,  Sean.

 

 

Be the first to reply!

Reply