23.2.3
I have copied the structure and cost from part A into product B in an Estimate.
There is only one operation with a Mach Run Factor of 1.0 hours/unit and an operation cost of 130.00.
I edit the Mach Run Factor to 1.5.
The operation cost remains at 130.00.
Q: Shouldn’t this cost automatically update to 195.00? I believe it did in Apps10.
When I calculate the estimate item the operation cost remains at 130.00.
Q: Shouldn’t the calculation update the operation cost to 195.00?
With the operation cost not updating the Estimate cost is not correct.