Skip to main content
Question

All created Analysis must be confirmed or cancelled before the operation no 10 is closed

  • June 25, 2026
  • 4 replies
  • 154 views

Forum|alt.badge.img+7

Hello,

 

We are receiving an error ‘All created Analysis must be confirmed or cancelled before the operation no 10 is closed’ when trying to approve an operation on the shop floor workbench in IFS Cloud 25R2. This was the confirmed analysis associated with the operation. Why would this error be happening? Thank you. 

 

Thanks,

Jay

4 replies

MikeCH
Superhero (Employee)
Forum|alt.badge.img+13
  • Superhero (Employee)
  • June 29, 2026

Hi ​@jayoneil98,

Is there perhaps a second analysis generated by the system? Or has the test plan been changed in the meantime (or has there been a new revision or something similar)?


Forum|alt.badge.img+7
  • Author
  • Hero (Customer)
  • June 29, 2026

I did a quick test and found that I didn’t have any unconfirmed analysis but it still doesn’t let me go through with approving the shop order operation. 


Forum|alt.badge.img+8
  • Hero (Partner)
  • July 2, 2026

Hi ​@jayoneil98 If you navigate to the Analysis Result page and search for Order No = 96 (from your first screenshot) do you only see the one confirmed result?

Just to double check as the search query is minimised on your screenshot, so may have been filtered by analysis number.

 


Forum|alt.badge.img+7
  • Author
  • Hero (Customer)
  • September 15, 2026

I actually have a new example. We have a confirmed analysis with no duplicates but we are still getting that same error message. I attached an image of the control plan and the confirmed analysis. I also included how the Quality Options for Control Plan Manufacturing was set up for that particular part. This is in 26R1. Is there something we are doing or is this an IFS bug and I should contact tech support?