Hi Community,
We are using Apps 9 UD15. It has been identified that some direct employees are experiencing issues when clocking to jobs. If the work is performed over the period 12:00:00 PM to 12:01:00 PM, the system removes 1 hour from the total labor booking, for example:
Employee 1:
starts production at 10:45:00 AM on 17 March 2021
Stops Production at 25:42:00 PM on 17 March 2021
Total labor time should be 3.98 hours, instead what is reported is 2.98 hours
I then stepped through (in TRN) adjusting the start and stop times to check the reporting entry and all were accurate until the 12:00 to 12:01 period. In the testing, if the clocking was broken out into two discrete entries, all was OK.
Please find attached my walk through. Any information or suggestions will be appreciated.
Thanks in advance.
Ken