Hi all,
We are working with IFS Applications (version , and I need guidance on how to split a single operation across multiple work centers, based on quantity.
Scenario:
-
We have a shop order with Lot Size = 20.
-
One of the operations is MONTAJ (assembly).
-
We'd like to perform this operation in two different work centers:
-
13 units in Work Center 555
-
7 units in Work Center 602
-
However, here are the limitations I'm facing:
Challenges:
-
I cannot edit the "Qty to Report" field in the Operation tab. It is always set to the full lot size (20)
-
Even if I create two MONTAJ operations manually, each one still expects 20 units instead of 30 and 20.
Questions:
-
What is the correct way to split an operation across multiple work centers based on quantity?
-
Can we adjust "Qty to Report" per operation?
-
Are there any other standard methods or best practices to reflect multi-work-center execution for the same operation?
Any guidance, workaround, or configuration suggestion would be highly appreciated.
Thanks in advance!