Skip to main content

We're based in the UK and currently on British Summer Time zone (UTC+1) . Our clocks are due to go backwards 1 hour on 30th October at 2:00am (1:00am UTC time) which will take us back to being the same time as UTC/GMT time zones. In IFS we have Background Jobs that run at around 1:00am in IFS and we're wanting to know if these jobs will run twice when the clocks change (at 1:00am British Summer Time and then at 1:00am when we go back to GMT/UTC time). Does anyone know if this will happen?

Be the first to reply!

Reply