Hi again,

I’m looking for a way to lock project activities once they are released.

When a project is released I’m creating a document containing all data from the project to have reference on what was aggred upon when it was released.

That will be added as an attached document to the project under revision control.

The problem is, the activities are not revision controled, so you can edit the activities after it has been released.

Is there any way revision control project activities like we can with order lines or documents?

Hi Kresten,

There are 3 ways of fulfilling this requirement I think;

  • Set a Baseline when you have released it and track the check ‘Activity Changed” on the details tab
  •  Put on history logging tracking the date that the activity is released
  • Make a custom date field and and event triggering on “Release” of the activity and then inputting the date in that field.

Hope this helps.