On the accounting side, I have to reduce the cost of inventory parts for every lot batch. I know I can do this through the “Inventory part modify level cost” as a Cost adjustment for each lot batch. But some of the inventory has more than 1000 lot beaches so I must adjust the cost one by one.so If there are other ways of doing it.
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.