Good day,
We’re trying to model this situation:
- Service Engineers can pick parts both from their personal van stock + directly from different warehouses
- The VAN of a Service Engineer ever contain a safety stock
- PSO can assign extra activities checking before the parts availability of the personal van of service engineer and only after the availability of stock in nearest warehouses
Configuration of Person
/*END OF SITUATION 1
/*START OF SITUATION 2:
Ok, now i want to check the logic for another situation:
- Service Engineers can pick parts only from their personal van
- Van stock is refilled by different warehouses
- The VAN of a Service Engineer ever contain a safety stock
- PSO can assign extra activities checking before the parts availability of the personal van of service engineer and only after the availability of stock in nearest warehouses
PLUS
In this case PLACE=VAN=451
*/ END OF SITUATION 2
Questions:
- Is the situation 1 modelled correctly ? Am I missing some configuration, or Person configuration is the only one and it’s correct like stated ?
- Is the situation 2 modelled correctly? Am I missing some configuration in configuration or in place ? Are my supposition correct ?
Thanks and Regards
Lorenzo