 Hello

I have the following question:

We can assign a default time type to a resource group, and it's applied automatically.

This works perfectly with MWO.

I have a calendar option in Time Type, but I can't seem to configure it. My situation is as follows:

1. A single resource group.

2. A time type is automatically added based on the schedule.

Is it possible to automatically register multiple time types with a single resource group?

The time types would be:

a) Regular Schedule

b) Weekend

c) Overtime

Could the task costs be dynamic depending on the schedule? IFS 25R1

Thanks.