PSO manual changes / "Drag & drop" rescheduling in Scheduling Gantt

  • February 5, 2025
  • 3 replies
  • 31 views

Forum|alt.badge.img+9

Hello,

 

We are experiencing an issue related to PSO manual changes (drag & drop rescheduling in the PSO gantt).

We are on 6.14.0.27 as of Saturday Feb 01 2025.

What we are seeing is as follows:

  • A user will drag the activity to a new location (either same resource, different time or a different resource & different time) 
  • Then when the activity is “dropped” (manual change initiated), the manual changes side bar / pop out box will be opened
  • However, the “Validate and Apply Changes” & “Apply Changes” & “Validate” buttons will be greyed out., The option is Cancel
  • This is the case with Preview Changes applied or not applied
  • The target (updated) date & time field will be reflected in the manual changes box, but PSO is not detecting that changes have been made
  • If the user then makes a subsequent change to any field in any of the fields in the manual changes side bar / pop out window or drags the activity icon a second time, only then are the change buttons available to select.

Could the issue be related to any of the following updates in the release notes?

  • CS0328702 - Fixed issue with resource selection not being populated correctly for manual changes of activities that are fixed to a resource.
  • CS0313356 - Fix activity labels not displayed in gantt issue
  • CS0273285 - Fix the bulk manual changes issue
  • CS0293757 - Fixed an issue where an activity could not be manually fixed to a resource with zero preference when we had another resource with zero preference with an availability.
  • PSO-3797 - Fixed issue with buttons being disabled when a manual change is made to fix the time to the start of the shift.
  • PSO-223 - Fixed an issue in setting date time fixed value for an activity, when manual changes are applied from the scheduling workspace with commit activity with route option
  • PSO-747 - Fixed an issue in populating fixed resource for an activity in manual change page in the scheduling workspace.
  • PSO-245 - Fixed an issue in manual change validation where an existing failed validation stopped successful validation from applying a manual change

3 replies

Forum|alt.badge.img+9
  • Author
  • Sidekick (Customer)
  • 35 replies
  • February 6, 2025

 


Forum|alt.badge.img+9
  • Author
  • Sidekick (Customer)
  • 35 replies
  • February 6, 2025

 


Forum|alt.badge.img+9
  • Author
  • Sidekick (Customer)
  • 35 replies
  • February 6, 2025

Recordings attached 


Reply