When you set up Rules of type ‘Commit Rule’ you have the option to include a Rule Window and a Day Pattern.
Multiple Commit Rules can be defined with different windows/days, and these can be included in a single Rule Collection. 
When the SDS runs, only one of the rule seems to be evaluated.

Is this a PSO constraint or a bug?

 

There are various scenarios that this could be used for including:

  • Committing 2 Activities on Monday-Friday, but only 1 at a time on Saturday and Sunday
  • Committing 2 Activities between 06:00 and 14:00, but only 1 at a time after 14:00
  • Having one rule with no Next Day Commit that runs from 06:00-15:00, and another with Next Day Commit that runs after 15:00 so that both the time of day and time to end of shifts is used when determining when to commit the next day’s activities

Hi Ian,

Currently only one commit rule can be processed because each time a rule is put in, it overrides the previous rules for the situation.

Please feel free to submit an idea.

Kind regards,

Khalid