Skip to main content

Does anyone know if there is a table similar to metrix_method or metrix_method_param in FSM6 that retains the details of the successfully completed jobs?  I am looking for the selection criteria for a particular run_id (mm_id).

Thanks,

Richard Spence

Hi @RiSpence,

The PM Generation runs are added in to the run log. There is functionality within the application to view these run logs filtering by type for PM generation and status for completed ones.

You may need to check the app param for the run logs to ensure that the logging level is set to include completed runs as well.

Kind regards,

Lee Pinchbeck


Reply