Lock down attachments on Change Order screen

  • May 21, 2026 8:54 PM UTC
  • 1 reply
  • 27 views

Forum|alt.badge.img+2

Is it currently possible to lock down items in the attachments pane on the Change Order screen once the CO is in a certain status?

For example, once a CO has gone from ‘Analyzed’ to ‘Approved’, items in the attachments pane can no longer be added, removed, modified. 

We are in the Apps10 environment - Thanks in advance.

 

 

1 reply

Abdul
Superhero (Partner)
Forum|alt.badge.img+20
  • Superhero (Partner)
  • May 22, 2026 1:38 AM UTC

Hi ​@jenna.kussman,

There is no such OOTB setup available to prevent documents for certain statuses.

Although, requirement can be achieved using Workflow configuration.

 

Regards 

Abdul Rehman