Skip to main content
Question

How to copy a product structure from one part to another part

  • Jun 17, 2026 5:16 PM UTC
  • 1 reply
  • 57 views

Forum|alt.badge.img

Hello, 

Where can I find a procedure on copying a product structure from one part to another part in IFS Cloud?

1 reply

richardwoods
Do Gooder (Partner)
Forum|alt.badge.img+6
  • Do Gooder (Partner)
  • Nov 24, 2026 10:58 PM UTC

Short answer: you copy it from the Product Structure page, using the Copy Revision command on the source part's structure. It copies the chosen alternates into a revision of the target part, so the target needs to exist as an inventory part first.

A setup along these lines

  • Make sure the target part exists as an inventory part, with Part Type something that carries a structure, such as Manufactured or Purchased.
  • Open Engineering > Structure > Product Structure > Product Structure on the source part and select the revision you want to copy.
  • From the More menu choose Copy Revision (the same idea exists for alternates as Copy Structure Alternate). For example, source PART-A revision 1 to target PART-B, new revision 1.
  • In the dialog, pick the target part and revision, and the alternates you want, some or all.
  • Tick Copy Attached Documents if the documents on the revision, alternate and line items should come across, and Copy Direct Supply if the Direct Supply tab should be copied.
  • Run it, then open the target part's structure and check the lines.

What is and is not copied

  • The components of the alternates you chose are copied into the new revision of the target part.
  • Serial pointers are not copied, so define those by hand.
  • New alternates that contain components get the default status set on the Site/Manufacturing page, so they may not come across in the status the source had.
  • Eco-footprint CTG emissions and RoHS information are copied for the * alternate only.

The awkward case

If the target part already has a structure, you will normally want a new revision for the copy rather than overwriting one, so check the revision you enter before running it.

Things to know

  • The Copy Revision command only appears once the revision has an engineering change level.
  • Menu names can differ slightly between releases and between product, recipe and configuration structures.

Worth a look: the IFS Cloud documentation topics Copy Product Structure Revision and Copy Structure Alternate.

Which release are you on, and does the target part already have a structure or revision?

Created with the help of Ask Olive.