In IFS Cloud 24R1, when we create a Work Order/Work Task for B2B and attach the document in Work Task and assign to contractor, in B2B Login Document count is shown but not the attached Document details. any settings is missed ?
Note: once we attach the document from B2B we can see the document in IFS Cloud Work Task.
