(1) Can I Check-in multiple file types in one document revision (1Document Class/1Document Number/1Revision/1Sheet)?
(e.g., save a combination of a DWG file, an EXCEL file and a PDF file)
(2) If (1) above is Yes, is it possible to Check-in multiple file types, each with only one file?
(e.g. Check-in only one file from the registered DWG file, EXCEL file and PDF file)