Hello.Can someone explain to me how time-phased safety margin works?My idea with the tools is to be able to specify a safety stock that is above or below the calculated value.When I try to specify a value and date and update the IPR, the value I specified disappears and no change to the safety margin is made.IFS 10IPR


Hi Per 

I was going through the below slides to find an answer, but I couldn't. I don't use this functionality myself. I recommend you get in touch with the IFS Consulting, if you stil don't have an answer. 

Thanks,
Asela
 


Reply