Hi,
I am experiencing an issue with the data that is transferred from my product structure to the component parts.
I use the Purchase Component Method: Customer order and I want to charge the supplier in some specific parts and for some other purchase parts I do not want to charge the parts shipped.
I expected that the product structure linked to my purchase part would influence how the component part is created. However, the expected values are not being transferred automatically.
I can manually override the field, but my requirement is to use a combination of both approaches depending on the product structure that is being used.
Am I missing a specific setting, or does anyone have experience with a similar setup and know how this can be achieved?
Thanks in advance for your help.

