Question

Reporting separate Delivery and Arrival Dates

  • 4 February 2022
  • 0 replies
  • 107 views

Userlevel 4
Badge +5
  • Do Gooder (Partner)
  • 8 replies

Good evening, all;

 

I have a client who want takes ownership of material at a foreign port of departure ( FOB term ) .   The date they are taking ownership corresponds to the Delivery Date on the PO Line.  There is then transit lead time build in while the goods travel from the foreign port to the clients dock to coincide with the  Arrival Date on the PO Line.  In order to show the ownership of the goods and the end of the Suppliers obligation, the receiving team is performing the Register Arrival on the Delivery Date into an Arrival type location created to hold these inbound parts.  In APS10,  they are having to enter both the Delivery Date and the Arrival Date during the Register Arrival step.  I cannot find where they can edit the Actual Arrival Date to reflect the date the material is physically at the dock.  Can some please let me know where that is?

 

Thank you in advance! 

 

  


This topic has been closed for comments