Question

Re-sequence PO lines

  • August 18, 2021
  • 3 replies
  • 138 views

Forum|alt.badge.img+5

Is there a way to resequence the lines on a PO?  Line number 2 should be Line number 1 for example

This topic has been closed for replies.

3 replies

Dumeesha Wanigarathna
Superhero (Partner)
Forum|alt.badge.img+16

Hi @emilyk8r ,

 

After saving the record it cannot be edited. You can do a data repair for that.


Thushitha Chandrasiri
Superhero (Partner)
Forum|alt.badge.img+21

You can put a line number when you are entering a line before saving. But, after saving, you cannot change the Line number. As a workaround, you can delete the line and enter a new line as required, but only if the PO is in Planned.

 

Thanks,


Forum|alt.badge.img+15
  • Superhero (Employee)
  • August 18, 2021

You can change the line number manually. before saving the line.  But as Dumeesha stated  aboveyou cannot change the line number once the line is saved.  

You can delete the line, if the PO header is in a planned status.