Skip to main content

Hi Guys,  I have migrated a number of product structures - instead f going through and making them buildable 1 by 1, is there a way of doing this on mass ?

I guess you will need to write a small script do this. Hope you will need a similar way to handle Routings too. 


Hi @AanHGTS, Would you be able to provide the syntax needed to do this please


@JannetteC I am afraid I can’t help you in that. You need a get help from a Technical person. 


In Apps10 EE you can use the Structure Alternates page to find and select all the Tentative structure alternates and right-click ‘Build’.

In Aurena use the Manufacturing Structure Alternates page to do the same.

Apps9 and previous I cannot recall if the Structure Alternates page was available.


Apps 9 - Structure Alternates is the same and all of the various state’s can be changed en masse from this overview.  A script is not required.  

The same is true for routings, use routing alternates, a script isn’t necessary.

 


Yes,correct I overlooked it.